NewsTrending

𝐂𝐎𝐍𝐒𝐓𝐑𝐔𝐂𝐓𝐈𝐎𝐍 𝐖𝐎𝐑𝐊 𝐀𝐓 𝐁𝐔𝐊𝐇𝐔𝐍𝐆𝐔 𝐒𝐓𝐀𝐃𝐈𝐔𝐌 𝐎𝐍𝐆𝐎𝐈𝐍𝐆

H.E FCPA Fernandes Barasa inspected the ongoing construction of the second and third phases of Kakamega’s Bukhungu Stadium, thanks to a partnership between the County Government of Kakamega and the National Government. This development is in preparation for upcoming national and international events.

The upgrade includes a complete overhaul of the playing pitch which is being resurfaced with modern, climate-resilient, easily draining, and highly durable grass. The process involves excavating the pitch to a depth of 650mm, installing a sub-base, and placing perforated drainage pipes at 5-meter intervals to channel rainwater. An irrigation system will be introduced to maintain the pitch during dry conditions.

Construction is also ongoing in the right 10,000-capacity C-section which includes a total overhaul of the playing surface; sitting areas; ablutions; media tribune; changing rooms for players, referees and VIP officials, among other executive units.

SUNGAITOTO situs toto deposit 5000 situs toto situs toto toto slot situs toto toto togel toto togel bo togel
slot gacor terbaik slot gacor thailand slot gacor hari ini slot gacor 2025
';