AN EXPRESSION OF INTEREST (EOI) TO DESIGN, BUILD, FINANCE, MAINTAIN & OPERATE A WASTE TO ENERGY PROCESSING PLANT IN KAKAMEGA COUNTY

[featured_image]
Download
Download is available until [expire_date]
  • Version
  • Download 126
  • File Size 654.86 KB
  • File Count 1
  • Create Date October 5, 2021
  • Last Updated October 6, 2021

AN EXPRESSION OF INTEREST (EOI) TO DESIGN, BUILD, FINANCE, MAINTAIN & OPERATE A WASTE TO ENERGY PROCESSING PLANT IN KAKAMEGA COUNTY